Ground Floor Add-On

Rear patio already demolished and boards sewer already encased with piers along side

Rear patio demolishedTempoary services reconnected,

Brick piers and hardwood floor framing in.

Floor framingWall framing started

wall framingThis back yard was a good space to make up frames in

Framing spacePly wall bracing, yellow tongue flooring

 

wall bracingKeeping internals protected whilst removing existing back external wall

 

Internal protectionsed turpis feugiat feugiat. Integer turpis arcu, pellentesque eget, cursus et, roof trussesRoof trusses on and bowral blue blacks loaded out

 

Valley boards Valley boards in. trusses fixed off and old roof left underneath to the last minute

 

TarpTarp ready to go when tiles come off.

 

Internal wall demoWith roof cover up more internal walls can come down

 

New internak wll framing New internal wall framing, looking out.

 

Beam inBeam put in to support old ceiling joists

 

Floor baseOrange tongue boards getting puhed around for final fix off before floating floor install

 

Now locked up with three and one bifold door all with lami glass to meet basix requirements

Internal plaster with first paint coats and floating floor boards getting slid into placeat, odio.

Plaster